Robert Shi-Heng Young
Medical Practice in Lexington, KY

License number
Kentucky 47648
Issued Date
Sep 18, 2014
Expiration Date
Feb 28, 2017
Category
Internal Medicine
Type
Hospital Based
Address
Address
900 Department Of Internal Medicine, 900 S Limestone Street, Ctw 303, Lexington, KY 40536
Education
Jefferson Medical College of Thomas Jefferson Univ., Philadelphia, 2001
Phone
(859) 323-6047 (Work)

Personal information

See more information about Robert Shi-Heng Young at radaris.com
Name
Address
Phone
Robert De Young, age 80
511 6Th St, Carrollton, KY 41008
(502) 732-8849

Professional information

Robert Young Photo 1

Robert Young - Lexington, KY

Work:
SVEC Enterprize
Landscaper/Laborer
Aerotek
Quality Control Inspector
Intertape Polymer Group Inc
slitter operator
GR Spring and Stamping, Inc - Richmond, KY
1 Operated robotic resistance welder
United States Marine Corps - Camp Lejeune, NC
United States Marine
Phillips Diversified Manufacturing - Annville, KY
Welder
Education:
BCTC - Lexington, KY
One Semester in Equine Science and MGT
Jackson County Area Technology Center
Certificate
Jackson County High School
Diploma
Skills:
Welding, General Maintenance, managing


Robert Young Photo 2

Regional Account Executive At Galls

Position:
Regional Account Executive at Galls, Regional Sales Executive at Galls, Inc. - An Aramark Company
Location:
Lexington, Kentucky Area
Industry:
Public Safety
Work:
Galls since Oct 2008 - Regional Account Executive Galls, Inc. - An Aramark Company since 1995 - Regional Sales Executive
Education:
Broward Community College


Robert Young Photo 3

Refrigeration Recovery And Purification

US Patent:
5361594, Nov 8, 1994
Filed:
Dec 14, 1993
Appl. No.:
8/166355
Inventors:
Robert E. Young - Lexington KY
International Classification:
G01K 1300
US Classification:
62129
Abstract:
Refrigerant recovery and purification system optionally capable of drawing a nearly full vacuum on the system to be evacuated and having multi-port valve means for setting to different configurations for different refrigerant processing cycles; e. g. , evacuation, deep vacuum, recovery, purification cycle, refrigerant charging, and oil charging, etc. Virgin refrigerant can be inputted from commercial cylinders or from refrigerant cans via a can manifold. Major components comprise: Inlet/outlet means 10, suction accumulator means 20, low-side purifying means (filter dryer) 30, compressor means 40, secondary coil means 70, purifying means (highside) 90, pump-down manifold means 100, storage means 120, oil injection means 140, virgin refrigerant supply means 170 and 180, vacuum pump means 200, and circulation control means 240.