MICHAEL JONES
Electrician in Longmont, CO

License number
Colorado 39894
Issued Date
Nov 13, 2007
Renew Date
Oct 22, 2015
Type
Electrical Apprentice
Address
Address
620 Grandview Mdw Dr A105, Longmont, CO 80503

Personal information

See more information about MICHAEL JONES at radaris.com
Name
Address
Phone
Michael Jones
4890 S Garrison St, Denver, CO 80123
Michael Jones
495 S Dayton St APT 3D, Denver, CO 80247

Organization information

See more information about MICHAEL JONES at bizstanding.com

Michael Jones, McP

5304 Bowersox Pkwy, Longmont, CO 80504

Industry:
Nonclassifiable Establishments


Daniel Michael Jones Memorial Fou

9461 Sierra Vis Rd, Longmont, CO 80504

Industry:
Business Services at Non-Commercial Site

Professional information

Michael Jones Photo 1

Client Relationship Manager At Powerphone, Inc.

Position:
Client Relationship Manager at PowerPhone, Inc.
Location:
Boise, Idaho Area
Industry:
Computer Software
Work:
PowerPhone, Inc. - Boise, ID since Apr 2012 - Client Relationship Manager New World Systems - Troy, MI Nov 2010 - Jan 2012 - Application Specialist Ada County Sheriff's Office - Boise, ID Oct 2005 - Oct 2010 - Dispatch Training Coordinator City of Longmont - Longmont, CO Aug 2003 - Aug 2005 - Communication Specialist
Education:
University of Phoenix 2005 - 2010
Bachelors, Criminal Justice Administration


Michael Jones Photo 2

Michael Jones - Longmont, CO

Work:
Amphibious Construction Battalion One
Quality Assurance Program Manager
United States Navy
Supervisor First Class Petty Officer. (EN1)
USS Peleliu LHA-5 - San Diego, CA
Leading Petty Officer
Steam Pump Regional Repair Center - Bremerton, WA
Shop Supervisor
South Central Regional Maintenance Center - Ingleside, TX
Planning Supervisor
USS Underwood FFG - Mayport, FL
Leading Petty Officer
Naval Security Force, Naval Hospital Jacksonville - Jacksonville, FL
Watch Commander
USS DeWert FFG - Mayport, FL
Leading Petty Officer
United States Navy
Diesel Engine and Auxiliary Systems Technician
Engine Repair Small Craft and Facility Response Team - Saint Marys, GA
Shop Supervisor
USS Doyle FFG - Mayport, FL
Maintenance Man
USS Boone FFG - Mayport, FL
Maintenance Man
Education:
Puget Sound Naval Shipyard - Bremerton, WA
NEC-4541 in NAMTS Hydraulic Repair
CAT School - Saint Augustine, FL
Certificate in Caterpillar 3512B Marine Diesel Diagnostics
NTC Mayport - Mayport, FL
Certificate in Supervisor Leadership/Management Continuum Core Skills
NTC Norfolk - Norfolk, VA
NEC in Basic Hydraulics Fundamentals
NTC Norfolk - Norfolk, VA
NEC-4355 in Lamps MKIII, RAST Aircraft Recovery Hydraulic Systems
NTC Great Lakes - Chicago, IL
NEC-4296 in Cargo Weapons Elevator Electro-Hydraulics
NTC Norfolk - Norfolk, VA
Certificate in Quality Assurance Inspector
NTC Norfolk - Norfolk, VA
Certificate in Quality Assurance Supervisor
MMI - Orlando, FL
Certificate in Mercury Outboard Government Servicing
OMC - Savannah, GA
Certificate in OMC outboard 2-stroke repair
OMC - Savannah, GA
Certificate in OMC Lower Unit Gearcase Repair
OJT - Mayport, FL
Certification in High Pressure Air Compressor- Dresser Rand
NTC Great Lakes - Chicago, IL
NEC-0000 in Diesel Engineering, Diesel Fundamentals
NTC Great Lakes - Chicago, IL
NEC-0000 in Advanced Technical Field Core Auxiliaries
NTC Great Lakes - Chicago, IL
NEC-4382 in FFG-7 Class Auxiliaries Technician


Michael Jones Photo 3

Method And System For Handling Destage Requests During Shut-Down In A Log-Structured Array

US Patent:
6490664, Dec 3, 2002
Filed:
Jun 14, 1999
Appl. No.:
09/333143
Inventors:
Michael Reese Jones - Longmont CO
Juan Li - San Jose CA
Dung Kim Nguyen - San Jose CA
Hai-Fang Yun - San Jose CA
Assignee:
International Business Machines Corporation - Armonk NY
International Classification:
G06F 1208
US Classification:
711154, 710 32, 714 24, 707200, 711114
Abstract:
Aspects for handling destage requests during shutdown in a log-structured array storage subsystem are described. In a method aspect, the method includes receiving a shut-down command, and utilizing at least three data structures for tracking destage requests when the shut-down command is received, wherein closing of open segments before completion of the shut-down is ensured. A further method aspect includes maintaining an outstanding requests list and destage requests list, forming a missing requests list based on the contents of the outstanding requests list and destage requests list when a shut-down command occurs, and tracking destage request processing with the outstanding requests list, destage requests list and missing requests list until all destage requests have been successfully completed.


Michael Jones Photo 4

Method And System For Increasing Concurrency During Staging And Destaging In A Log Structured Array

US Patent:
6463503, Oct 8, 2002
Filed:
May 12, 1999
Appl. No.:
09/311209
Inventors:
Michael Reese Jones - Longmont CO
Juan Li - San Jose CA
Dung Kim Nguyen - San Jose CA
Hai-Fang Yun - San Jose CA
Assignee:
International Business Machines Corporation - Armonk NY
International Classification:
G06F 1214
US Classification:
711114, 711111, 711112, 711113, 711155, 711157, 711158, 707203, 707204, 707206
Abstract:
Aspects for increasing concurrency during staging and destaging of a log structured array (LSA) are described. In an exemplary method aspect, the method includes determining a process type making a request for access to a locking mechanism associated with an LSA directory entry for a logical track, and determining a lock status for the locking mechanism. Access to the locking mechanism is then provided according to the determined process type and lock status. Further, a destaging process is allowed to obtain an available locking mechanism in a read-write mode, a staging process is allowed to obtain an available locking mechanism in a read-only mode, and a garbage collection process is allowed to obtain an available locking mechanism initially in a read-only mode and subsequently in a read-write mode, wherein increased concurrency results during the staging and destaging processes.