Michael D Cleary
Engineers at Washington St, Denver, CO

License number
Colorado 70081
Issued Date
Dec 31, 2013
Renew Date
Dec 31, 2013
Type
Engineer Intern
Address
Address
2165 S Washington St, Denver, CO 80210

Professional information

Michael Cleary Photo 1

Michael Cleary - Centennial, CO

Work:
OK, KS, CO
Education/Project Manager
FAA ACADEMY, Mike Monroney Aeronautical Center - Oklahoma City, OK
ATC Instructor OU Staff
JEPPESEN - SANDERSON, INC - Englewood, CO
Manager, Flight Procedures & Standardization
Centennial Airport
Signature Flight Support
Jeppesen Sanderson - Denver, CO
Principal Aeronautical Information Specialist/NOTAM Analyst
NATIONAL CHECK CASHERS - Oklahoma City, OK
Internal Control Manager, HQ
LEAR COMPANY, GENNA PROJECT, Riyadh, Saudi Arabia
AIR TRAFFIC CONTROL (ATC) TRAINING SPECIALIST
MILITARY SERVICE UNITED STATES AIR FORCE - Enid, OK
Assistant Chief Controller/Watch Supervisor, Radar Approach Control (RAPCON)
MILITARY SERVICE UNITED STATES AIR FORCE
Air Traffic Controller USAF
MILITARY SERVICE UNITED STATES AIR FORCE - Newbury
Chief, Air Traffic Control Operations
MILITARY SERVICE UNITED STATES AIR FORCE
ATC/TERPS Developer/Reviewer
MILITARY SERVICE UNITED STATES AIR FORCE - Brandon
Watch Supervisor Mobile Rapcon
MILITARY SERVICE UNITED STATES AIR FORCE - Peru, IN
Assistant Watch Supervisor Rapcon
MILITARY SERVICE UNITED STATES AIR FORCE
Watch Supervisor/Sr. Controller, Tower/Radar
MILITARY SERVICE UNITED STATES AIR FORCE
Watch Supervisor
MILITARY SERVICE UNITED STATES AIR FORCE - Limestone, ME
ATC Specialist, Rapcon/Tower
MILITARY SERVICE UNITED STATES AIR FORCE - Shemya, Alaska, US
ATC Specialist, GCA/Tower
MILITARY SERVICE UNITED STATES AIR FORCE - Everett, WA
ATC Specialist, GCA/Tower
MILITARY SERVICE UNITED STATES AIR FORCE - Biloxi, MS
ATC Academy Student
LACKLAND AFB - San Antonio, TX
Basic Training Student
Education:
Rose State College - Midwest City, OK
AA in General Studies
Community College of the Air Force Air Traffic Control School
Management and Counseling


Michael Cleary Photo 2

Michael Cleary - Denver, CO

Work:
Petroleum Field Services
Engineer I
SKYLINE ROOFING AND EXTERIORS - Denver, CO
Project Coordinator
State of Colorado - Denver, CO
Pemit Engineer
SAGE APPRAISAL ASSOCIATES - Cape Coral, FL
Property Appraiser
VANDERBILT COUNTRY CLUB - Naples, FL
Head Golf Professional
Education:
FLORIDA GULF COAST UNIVERSITY - Fort Myers, FL
B.S. in Civil Engineering
THE UNIVERSITY OF DETROIT - Detroit, MI
NA in Architectural Design
Skills:
Technical writing, Regulatory Review, AutoCAD Civil 3D, Carlson Survey, Modeling, Permitting, Project Coordination, Budgeting, Inspection and Reporting


Michael Cleary Photo 3

Division Customer Service Manager At Hcahealthone

Position:
Division Customer Service Manager at HcaHealthONE
Location:
Greater Denver Area
Industry:
Medical Devices
Work:
HcaHealthONE - Division Customer Service Manager


Michael Cleary Photo 4

Michael Cleary - Centennial, CO

Work:
OK, KS, CO OK, KS, CO
Signature Flight Support
JEPPESEN - SANDERSON, INC - Englewood, CO
Manager, Flight Procedures & Standardization
JEPPESEN - SANDERSON, INC
Principal Aeronautical Information Specialist
NATIONAL CHECK CASHERS - Oklahoma City, OK
Internal Control Manager, HQ
LEAR COMPANY, GENNA PROJECT, Riyadh, Saudi Arabia
AIR TRAFFIC CONTROL (ATC) TRAINING SPECIALIST
FAA ACADEMY, Mike Monroney Aeronautical Center - Oklahoma City, OK
OU Staff
Education:
Corporate Supply Chain Directors University
CSC in evaluation


Michael Cleary Photo 5

Marine Subsea Riser Systems And Methods

US Patent:
2012027, Nov 1, 2012
Filed:
Apr 26, 2012
Appl. No.:
13/456937
Inventors:
Douglas Paul Blalock - Katy TX, US
Michael Patrick Cleary - Denver CO, US
Thomas Patrick Mataway - Spring TX, US
Steven Dirk Koepke - Houston TX, US
Assignee:
BP CORPORATION NORTH AMERICA INC. - Houston TX
International Classification:
E21B 17/01, E21B 43/013, E21B 33/13, E21B 33/064
US Classification:
166341, 166367, 166363, 166335
Abstract:
A riser system connects a subsea source of hydrocarbons to a collection vessel. The system includes a riser, a lower end of the riser fluidly coupled to a seal stem, the seal stem in turn fluidly attached to a lower riser assembly through a polished bore receptacle. The upper end of the riser is connected to the collection vessel, the riser being maintained in a near vertical position. Methods of installing and using the riser systems for killing and cementing wells are described.