JOSE R FLORES
Electrician at Tallant St, Houston, TX

License number
Texas 136569
Expiration Date
Jan 16, 2018
Category
Apprentice Electrician
Address
Address
151 Tallant St, Houston, TX 77076
Phone
(713) 423-9724

Professional information

Jose Flores Photo 1

Offshore/Desalination Manager At Aqua-Chem, Inc.

Position:
Regional Manager at Aqua-Chem, Inc,., Service Manager at Aqua-Chem Inc., Regional Manager Oil and Gas at Aqua-Chem, Inc., Offshore/Desalination Manager at Aqua-Chem, Inc.
Location:
Houston, Texas Area
Industry:
Oil & Energy
Work:
Aqua-Chem, Inc,. - Regional Manager Aqua-Chem Inc. since Dec 2003 - Service Manager Aqua-Chem, Inc. since Dec 1998 - Regional Manager Oil and Gas Aqua-Chem, Inc. since Dec 1998 - Offshore/Desalination Manager


Jose Flores Photo 2

Manager Safety Operations At Waste Management, Inc

Position:
Manager Safety Operations at Waste Management, Inc
Location:
Houston, Texas Area
Industry:
Renewables & Environment
Work:
Waste Management, Inc - Manager Safety Operations


Jose Flores Photo 3

Jose Flores - Houston, TX

Work:
MLN Company - Houston, TX
Safety Manager
Performance Contracting INC - Houston, TX
Site Safety Manager
A & L Industrial Services - Houston, TX
Safety Manager
Brand Energy Solutions - Pasadena, TX
Scaffold General Foreman
Thompson Industrial Services - Sumter, SC
Safety Manager
Brock Specialty Services - Houston, TX
Safety Manager
Brand Scaffold - Pasadena, TX
Safety Representative
United States Army - Washington, DC
Staff Sargent
Education:
Lee College - Baytown, TX
Medical Technician
University of Maryland - Polk, TX, US
General Studies


Jose Flores Photo 4

Sr Project Engineer At Bechtel

Position:
Sr Project Engineer at Bechtel
Location:
Houston, Texas Area
Industry:
Construction
Work:
Bechtel - Sr Project Engineer
Education:
Rice University 1970 - 1975


Jose Flores Photo 5

Network Tech Ii At Kbr

Position:
NETWORK TECH II at KBR
Location:
Houston, Texas Area
Industry:
Information Technology and Services
Work:
KBR - NETWORK TECH II


Jose F Flores Photo 6

Jose F Flores, Houston TX

Specialties:
Internist
Address:
2101 Nasa Pkwy, Houston, TX 77058
1009 Main St, Pasadena, TX 77506
Education:
Cornell University, Weill Cornell Medical College - Doctor of Medicine
Board certifications:
American Board of Internal Medicine Certification in Internal Medicine


Jose Flores Photo 7

Smart Plant P&Amp;Id Design At Woodgroup Mustang

Position:
Process Piping Design at Alliance Engineering
Location:
Houston, Texas Area
Industry:
Oil & Energy
Work:
Alliance Engineering since Nov 2010 - Process Piping Design Mustang Engineering 2010 - 2012 - process Design Rimkus Consulting Group Mar 2001 - Aug 2006 - Technical Support
Education:
Houston Community College 1998 - 2000
Associate, arts


Jose Flores Photo 8

Independent Adjuster

Position:
Independent Adjuster at Adjuster
Location:
Houston, Texas Area
Industry:
Insurance
Work:
Adjuster since Jan 2011 - Independent Adjuster


Jose Flores Photo 9

Jose Flores - Houston, TX

Work:
ds dist.
sales rep


Jose Flores Photo 10

Adjustable Telescoping Support Mechanism For Use With Concrete Forming Systems

US Patent:
2010021, Sep 2, 2010
Filed:
Mar 2, 2009
Appl. No.:
12/396134
Inventors:
David Wolf - Houston TX, US
Jose Flores - Houston TX, US
Armando Velez Santana - Houston TX, US
Assignee:
El Sacrificio Ventures, LLC - Houston TX
International Classification:
E04B 1/38, E04C 5/12
US Classification:
52702, 52719
Abstract:
An adjustable telescoping support mechanism is provided that may be connected between members of two positionally separated and supported truss members for providing support for a concrete-forming surface for fabricating building floors or ceilings. The telescoping support mechanism may be easily positioned adjacent to the location of vertical concrete structures of a building, such as building support columns, stairwells or elevator shafts in order to tie in a concrete floor or ceiling to the vertical concrete structure. The mechanism provides a means for fabricating a floor or ceiling adjacent to a vertical concrete structure either prior to or after the vertical structure has been fabricated, without the need for supporting scaffolding, which impedes normal construction activity and creates safety issues.