DAVID E BOYLE
Engineers in Pittsburgh, PA

License number
Pennsylvania PE022552E
Category
Engineers
Type
Professional Engineer
Address
Address
Pittsburgh, PA 15203

Personal information

See more information about DAVID E BOYLE at radaris.com
Name
Address
Phone
David Boyle
51 Wynmere Dr, Horsham, PA 19044
David Boyle, age 45
3327 Powelton Ave, Philadelphia, PA 19104
David Boyle
3253 Glengreen Dr, Lancaster, PA 17601
David Boyle, age 42
3082 Sticks Rd, Glen Rock, PA 17327
(717) 235-3293
David Boyle, age 77
4224 King George Dr APT C, Harrisburg, PA 17109
(717) 545-4941

Professional information

David Boyle Photo 1

Chief Financial Officer At Orrstown Bank

Position:
Chief Financial Officer at Orrstown Bank, Regional President at PNC, Regional President at PNC
Location:
Greater Pittsburgh Area
Industry:
Financial Services
Work:
Orrstown Bank - Shippensburg, PA. since Aug 2012 - Chief Financial Officer PNC since Jan 2007 - Regional President PNC since Jun 2005 - Regional President PNC Jul 2010 - Jul 2012 - EVP - Chief Performance Officer Wayne Bancorp, Inc. Jan 1999 - Jun 2005 - President & CEO Wayne Bancorp, Inc. Jan 1991 - Jan 1999 - CFO
Education:
Westminster College (PA) 1982 - 1986
BA, Accounting and Business/Management
Skills:
PeopleSoft, Vendor Management, Accounting, Talent Acquisition, Talent Management, Sales, Human Resources, Project Management, Strategy


David Boyle Photo 2

Finance Executive - Pnc Financial Services

Position:
Chief Performance Officer / Finance Executive at PNC Financial Services Group
Location:
Pittsburgh, Pennsylvania
Industry:
Financial Services
Work:
PNC Financial Services Group - Pittsburgh, PA since Jul 2010 - Chief Performance Officer / Finance Executive Ernst & Young 1986 - 1988 - Staff
Education:
Westminster College (PA) 1982 - 1986
BA, Business/Accounitng


David Boyle Photo 3

David Boyle - Pleasant Hills, PA

Work:
Garda Cash Logistics
Branch Manager
Dicks Sporting Goods Distribution Center - Smithton, PA
Loss Prevention Agent
Vector Security Systems - Pittsburgh, PA
Operations Manager/Guard Division
Education:
DUQUESNE UNIVERSITY - Pittsburgh, PA
B.A. in Sociology/Criminal Justice


David Boyle Photo 4

Computer Software Professional

Location:
Greater Pittsburgh Area
Industry:
Computer Software


David Boyle Photo 5

Bolt With Integral Locking Member

US Patent:
6164886, Dec 26, 2000
Filed:
Aug 24, 1999
Appl. No.:
9/382021
Inventors:
John C. Matarazzo - Monroeville PA
Ian L. W. Wilson - Murrysville PA
David E. Boyle - Pittsburgh PA
David H. Roarty - Murrysville PA
George E. Rudd - Murrysville PA
Assignee:
Westinghouse Electric Company LLC - Pittsburgh PA
International Classification:
F16B 3900
US Classification:
411176
Abstract:
A high strength bolt fastens a baffle plate and a former plate of a pressurized water nuclear reactor pressure vessel together. The bolt has a head portion and an integral locking member extending from the head portion for engaging one of the structural members to lock the bolt with the structural member. The integral locking member portion has a lower yield stress than the yield stress of the shank. A lower yield stress may be obtained by selective annealing. The locking member is less susceptible to stress corrosion cracking in high temperature, high pressure water of commercial nuclear power reactors.


David Boyle Photo 6

Lower Reactor Internals Up-Ending Device

US Patent:
6266386, Jul 24, 2001
Filed:
Oct 13, 1999
Appl. No.:
9/417350
Inventors:
Raman G. Patel - Pittsburgh PA
Robert E. Meuschke - Monroeville PA
Moshe A. Mahlab - Pittsburgh PA
David E. Boyle - Pittsburgh PA
Assignee:
Westinghouse Electric Company LLC - Pittsburgh PA
International Classification:
G21C 1902, G21C 1920
US Classification:
376260
Abstract:
An apparatus and method are provided for inverting the lower internal assembly of a nuclear reactor. The apparatus includes a frame which is sized to receive the lower internal assembly. The frame supports the lower internal assembly as it is being inverted. The apparatus also includes a spider assembly which fits within the lower internal assembly and provides support for a baffle assembly located therein. The method includes the steps of removing the lower internal assembly from a reactor vessel and rotating the lower internal assembly prior to performing maintenance.