DANIEL J THIELE
Engineering in Omaha, NE

License number
Massachusetts 45731
Issued Date
Feb 9, 2004
Expiration Date
Jun 30, 2018
Type
Civil Engineer
Address
Address
Omaha, NE 68138

Organization information

See more information about DANIEL J THIELE at bizstanding.com

Thiele Geotech, Inc.

13478 Chandler Rd, Omaha, NE 68138

Industry:
Engineering Services
Registration:
Jan 1, 1976
Phone:
(402) 556-2171 (Phone), (402) 556-7831 (Fax)
State ID:
F08000005385
Business type:
Foreign Profit Corporation
Presidents:
Michael Gerdes (Senior Vice President),Daniel J. Thiele (President)
Agent:
Ct Corporation System,1200 S Pne Is Rd, Fort Lauderdale, FL 33324 (Physical)
EIN:
47-0794664


Thiele Geotech, Inc

13478 Chandler Rd, Omaha, NE

Industry:
CONSULTING ENGINEERING SERVICES: EARTH RETAINING SYSTEMS DESIGN, GEOTECHNICAL ENGINEERING, MATERIALS TESTING AND ENVIRONMENTAL ENGINEERING
Registration:
Jul 12, 2006
State ID:
000157317
Business type:
Foreign Corporation
DIRECTORs:
Michael Fred Gerdes (TREASURER), 21401 Cedarwood Rd, Elkhorn, NE 68022 (Physical),Robert K Lapke (VICE PRESIDENT), 746 S Harrison St, Papillion, NE 68046 (Physical),Daniel J Thiele (PRESIDENT), 6729 S 91 St, Omaha, NE 68127 (Physical),...
Agent:
Ct Corporation System,450 Veterans Memorial Pkwy SUITE 7A, East Providence, RI 02914 (Physical)


THIELE GEOTECH, INC

Omaha, NE 68127

Registration:
Nov 26, 2001
State ID:
61915125
Business type:
FOREIGN BCA
Expiration:
PERPETUAL
Agent:
C T Corporation System,208 So Lasalle St SUITE 814, Chicago, IL 60604 (Physical)


Thiele Geotech Inc - Daniel Thiele Pe

13478 Chandler Rd, Omaha, NE 68138

Categories:
Consulting Engineers, Environmental Engineers, Petroleum Engineers, ...
Phone:
(402) 556-2171 (Phone), (402) 556-7831 (Fax)
In business since:
2007
Products:
Consulting, Drilling
Additional:
Geotechnical, Material, &

Professional information

Daniel Thiele Photo 1

President At Thiele Geotech, Inc.

Position:
President at Thiele Geotech, Inc.
Location:
Greater Omaha Area
Industry:
Civil Engineering
Work:
Thiele Geotech, Inc. since Jan 1996 - President
Education:
University of Nebraska-Lincoln 1986 - 1990
MS, Civil Engineering
University of Nebraska at Omaha 1981 - 1985
BS, Civil Engineering
Skills:
Geotechnical Engineering, Environmental Engineering, Materials, Soil, Retaining Walls, Engineering, Concrete, Contract Management
Interests:
UNOmaha Maverick Hockey, fine food & wine, Nascar, Mustangs


Daniel Thiele Photo 2

Building Block, System And Method

US Patent:
2012031, Dec 13, 2012
Filed:
Jun 11, 2011
Appl. No.:
13/158411
Inventors:
John J. Gran - Lincoln NE, US
Daniel Thiele - Omaha NE, US
Larry J. Ebert - Apple Valley MN, US
Michael Furlong - Cambridge MN, US
Assignee:
STONE STRONG LLC - Lincoln NE
International Classification:
E04B 2/18, B29C 39/10, E04G 21/14
US Classification:
521221, 525881, 264 401
Abstract:
A block system includes a main block that has the lift and alignment devices positioned to overlie a longitudinal axis that intersects a center of gravity of the main block, and has a defined distance from the lift and alignment devices to a front surface of the main block. The block system further includes extended blocks that each has the lift and alignment devices positioned not to overlie a longitudinal axis that intersects a center of gravity of the extended block, but has the same defined distance from the lift and alignment devices to a front face of the extended block that exists on the main block. The recessed portions of the block may be larger than the lift and alignment devices, thereby allowing the blocks to be stacked in either a vertical wall or in a setback wall.


Daniel Thiele Photo 3

Building Block, System And Method

US Patent:
2013021, Aug 29, 2013
Filed:
Apr 12, 2013
Appl. No.:
13/861539
Inventors:
Stone Strong LLC - , US
Daniel Thiele - Omaha NE, US
Larry J. Ebert - Apple Valley MN, US
Michael Furlong - Cambridge MN, US
Assignee:
Stone Strong LLC - Lincoln NE
International Classification:
E04G 21/14
US Classification:
521252
Abstract:
A block system includes a main block that has the lift and alignment devices positioned to overlie a longitudinal axis that intersects a center of gravity of the main block, and has a defined distance from the lift and alignment devices to a front surface of the main block. The block system further includes extended blocks that each has the lift and alignment devices positioned not to overlie a longitudinal axis that intersects a center of gravity of the extended block, but has the same defined distance from the lift and alignment devices to a front face of the extended block that exists on the main block. The recessed portions of the block may be larger than the lift and alignment devices, thereby allowing the blocks to be stacked in either a vertical wall or in a setback wall.